Skip to content

Greenbyte Ideas

Our approach to product feedback

Here at Power Factors, we take product feedback extremely seriously. We believe that listening to our customers, team members, and prospects - by taking their ideas on board - is a sure-fire way to build better products.
We use your feedback to identify the most important features, ideas, pain points, and opportunities so that you can get more value from our products as efficiently as possible.


The benefits of giving us your product feedback

If you take the time to submit your product feedback to us, it means that you have a direct say in how our products develop over time. It means that your ideas are valued and listened to, rather than filed away and ignored.
Ultimately, it allows us to work with you to build the best products we possibly can.

What happens to your product feedback

Our product teams meet regularly with the CSMs, to go through new ideas. Once we have verified that an idea isn’t already available in the system, and seems like a good idea, we change the status to Accepting Votes. Then more people can vote, prioritize, and give us information. This allows us to gauge demand, gather use cases, and establish impact & value.

If we decide to implement an idea, the status will change to Planned or In Development. When it’s done, the status will change to Delivered. Anyone who has submitted or voted on a specific request will be notified when the status of the request is updated. We will always provide an explanation as to the nature of the status update.

Unfortunately, not all requests are in line with our vision and strategy, so sometimes we reject them. When this happens, the status will be changed to Archived and we’ll add a note to let you know that it won’t be delivered.


How we choose what to implement

When we plan a release, we use many factors to help decide which suggestions to implement, including:

  • Customer feedback - there are many ways we listen for your feedback:
    formal customer interviews and other research activities
    events like conferences and trade shows
    comments and votes on issues here in Greenbyte & BluePoint Influence
  • CSM team insights - our CSM team knows which issues are the most challenging and most common for customers.
  • Product analytics - we track how users move through the system, which helps us understand how existing features are being used.
  • Product strategy - our long-term strategic vision for the products.
If you reach out directly to our support or customer success teams, they'll be able to look up the ideas for you, but they won't have any additional information or provide an estimate for when your item will be reviewed.


Custom applications

Sometimes you need functionality that is specific to your needs and not necessarily useful for other customers or in line with Power Factors strategic goals. These special requests are addressed through custom applications, which can be developed by you, using the Greenbyte API, by third-party partners, or by Power Factors for an additional fee. If you are interested in having a custom application built, contact your CSM.
  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback

268 results found

  1. Order by device number not Power

    Have the option to when hovering over a data table the data displayed is in the device number order, not highest value (power, current)

    e.g. when looking power produced by each Inverter module for inverter 1 be ordered 1.1, 1.2, 1.3, 1.4 etc not in the order in which they are producing the most power

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  2. Make Analyse URL links include the filtering

    Make the Analyse links include the filtering. For example if I select the time period to be 2021 I'd like the link shared to also be filtered for 2021

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  3. Make the URL links human readable

    Make the URL links human readable, so that I can alter them to adjust the outputs, e.g. for example if I wanted to create a link outside of Greenbyte to refer to show something within Greenbyte

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Data studio  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  4. See Service Contract on Status events in Task

    It would bee really great to be able to see what Service Contract different Status events have in a task. Could it be added as a column under Status events?
    And also the possibility to change the category if needed directly in the task.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Plan  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  5. Clickable header in monitor/analyze to allow moving up and down the device hierarchy

    When showing a dashboard in Analyze for a site, I can click on a device on the site and get to the dashboard for that device. For that dashboard I would like to see the "path" I moved, i.e. Portfolio/Site/Device as the header, and I would like to be able to click on e.g. "Site" to get back to the site dashboard.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  6. o Service hours/allowed scheduled maintenance cannot be count into the contractual availability.

    Each contract is different and a common detail in a service contract like a maximum allowed number of maintenance hours (not taken into account for the unavailability) is not possible in Greenbyte.
    Therefore the numbers in the greenbyte report must be recalculated by the number of scheduled maintenance in order to calculate the contractual availability.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  7. Overlapping curtailment schemes: lost production calculations

    Calculate lost productions per category (commercial, grid, owner, etc) taking into account simultaneous curtailment signals and setpoints. A dynamic calculation would provide more accurate results.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    Accepting Votes  ·  Giorgio responded

    Thanks for your feedback, this is a great request. It’s open for voting from other users.

  8. Add "exclude data" functionality in Dashboards and Data Studio

    When I am in a dashboard or Data Studio, and I select a custom time span (e.g. 19/03/2020 to 19/03/2021) with an aggregation per month, the platform will still return the full value for the months of March 2020 and 2021.

    The Reports have a feature to "exclude data" that does exactly what I would need here - excluding the data from 01-18/03/2020 and from 20-31/03/2021.
    Currently there is no way around but aggregating per week/day, but that still doesn't allow me to see March as 1 figure.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    Accepting Votes  ·  Eliane responded

    Thanks for your feedback, this is a great request. It’s open for voting from other users.

  9. Next asset filtering option would help a lot

    In general the UI requires too many mouse clicks when working repetitive tasks.

    For instance, we have a task like "Perform status categorization for every wind turbine for previous month". Each time, through the filter settings, we have to unselect the current turbine, and select another one. Meanwhile some of the filter settings will be erased.

    Especially some of the windfarms have a clutter of the same statuses. Wind farm A will be curtailed so often, that we want to review them with two filter settings:
    1. Do not show Curtailed statuses (to see what is really happening with the…

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  GUI  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    Accepting Votes  ·  Eliane responded

    Thanks for your feedback, this is a great request. It’s open for voting from other users.

  10. Loss of Production Site Grid Export Limit

    Some wind farms have grid export limits that are less than the installed capacity of the wind farm. When the farm output is at its export capacity, for any turbines that are stopped I would like the loss of production to be zero as the wind farm is not actually losing this potential production.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    Accepting Votes  ·  Eliane responded

    Thanks for your feedback, this is a great request. It’s open for voting from other users.

  11. Display comment for tasks in report section

    When generating a report and including a custom section regarding "Tasks", one can add a column named "Comments". Currently that only adds a small symbol in that column (see attached image) but would it instead be possible for the text to be displayed in the column?

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Reports  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    Accepting Votes  ·  Eliane responded

    Thanks for your feedback, this is a great request. It’s open for voting from other users.

  12. Show windpark/wind turbine/device name in website title

    In our operations we often have multiple Greenbyte tabs open in Chrome. It would be very beneficial if the name of page would contain the name of the item you have opened so you can go to the page you want directly instead of checking them one by one.

    For example;

    Greenbyte - Wind Farms >>> Greenbyte - WindparkName
    Greenbyte - Devices >>> Greenbyte - Device
    Name
    etc. etc.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  GUI  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    Accepting Votes  ·  Eliane responded

    Thanks for your feedback, this is a great request. It’s open for voting from other users.

  13. 2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    Accepting Votes  ·  0 comments  ·  Plan  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  14. Adding the "team on site marker" from the list to the Monitor/Portfolio view

    The possibility to add the "team on site marker" on a widged.
    Best would be to see the "end time" as well.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  View  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  15. Get notification for an overdue in the Plan section

    In the Plan section suggest to get a notification if someone goes beyond the working end time.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Plan  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  16. Make it possible to indicate a Task or HSE Event in the Plan section is "IN PROGRESS"

    Currently, tasks and HSE events in Greenbyte can only be designated as "Unresolved" or "Resolved". Being able to indicate that a task is in progress would make it possible to monitor how quickly action is being taken and ultimately closed out.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Plan  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  17. Tracker availability from statuses

    Today, the tracker availability is only calculated via the deviation of angles. We would need to also have it calculated following (stop) statuses.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  18. PR at meter level based on IEC

    In solar, calculate the performance ratio at meter level based on the IEC standard definition.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  19. Improve possibilities for signal data in status export

    Recently, the possibility to add a singal data to the status export was released.
    A possible way to improve this could the following: not only having the averaged value for the whole status period, but also the possibility to have the measurement of the desired variable at the beginning and end of a stop. This can be quite useful too at some cases:
    -like ambient temperature for start-stop of icing stops,
    -wind speed and ambient temperature for bat protections stop or even
    -light intensity when shadow flicker starts/stop.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Data export  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  20. Make it possible to set heatmap upper and lower limits in Data Studio

    When creating a Heatmap widget on an Analyze Dashboard, the user can easily fix the scale of the axis, by specifying the upper and/or lower limit.

    However, this functionality doesn't existing when creating a heatmap in the Data Studio. This makes it very difficult to compare different temperature signals, since you cannot fix them to the same scale.

    This would be a very useful addition to the Data Studio.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Data studio  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  • Don't see your idea?

Feedback and Knowledge Base